Bondi Junction Apartment Renovation | Progress Video 3 | Waterproofing

About This Project

This progress video, Domus Homes’s Managing Director, David Edelstein, covers the waterproofing process in bathroom/wet room areas (WCs). There are many methods of doing this, however Domus Homes’s builders ensure they do not only comply with the Building Code of Australia, but also exceed the standard. This guarantees there is no water transmission to the apartment beneath and the salt from the concrete mix doesn’t come up through the tiles and ruin the finish/structural integrity of the building. The result is a water-tight room with dry tiles.

 

The Gypocking is being finished, the roughing for the electrical is complete.

Some pipework had to be moved for the kitchen bench area, which is also completed.

 

 

 

We’re also on:

Facebook
Instagram
Houzz

 

Category
Video
Tags
Apartment, bathroom, construction, design, fit out, gyprocking, interior, kitchen, makeover, management, plan, renovation, tiles, waterproof, waterproofing